Georgia statutory lien waiver forms

Georgia law prescribes these lien waiver forms word for word.

Form status
Mandatory Statutory Form State
Statute
O.C.G.A. § 44-14-366
Official text
legis.ga.gov — SB 315 (2020), as passedgov.georgia.gov — SB 143 (2021), as passed
Rules verified
November 2026
Georgia: 90-day Affidavit of Nonpayment deadlineIf you are not paid, file an Affidavit of Nonpayment within 90 days after the waiver date. EZLienWaivers prints the exact deadline (waiver date + 90 calendar days) on screen, in the PDF and in the audit summary. O.C.G.A. § 44-14-366

Georgia notary, witness & font rules

Georgia prescribes an interim and a final waiver and release form, in at least 12-point type, each with a witness line and a NOTICE that the waiver binds 90 days after execution unless the claimant files an Affidavit of Nonpayment. Since SB 315 the waivers cover lien and bond rights only.

RuleGeorgiaCitation
Statutory formsInterim payment (d) and final payment (e)O.C.G.A. § 44-14-366(d), (e)
Type sizeAt least 12 point font; need not be boldface capitalsO.C.G.A. § 44-14-366(d), (e)
WitnessOne (WITNESS) signature line in each formO.C.G.A. § 44-14-366(d), (e)
NotaryNot required for the waiver (affidavit of nonpayment is sworn)O.C.G.A. § 44-14-366(g)(2)
Affidavit of NonpaymentWithin 90 days after the date the waiver is executed (was 60 before SB 315)O.C.G.A. § 44-14-366(g)(2)
ScopeWaives lien and labor/material bond rights only, not other rights or remediesO.C.G.A. § 44-14-366(a) (SB 315)
Missing NOTICEForm unenforceable and invalid without the NOTICE languageO.C.G.A. § 44-14-366(d), (e)

Exact statutory notice text

NOTICE: WHEN YOU EXECUTE AND SUBMIT THIS DOCUMENT, YOU SHALL BE CONCLUSIVELY DEEMED TO HAVE WAIVED AND RELEASED ANY AND ALL LIENS AND CLAIMS OF LIENS UPON THE FOREGOING DESCRIBED PROPERTY AND ANY RIGHTS REGARDING ANY LABOR OR MATERIAL BOND REGARDING THE SAID PROPERTY TO THE EXTENT (AND ONLY TO THE EXTENT) SET FORTH ABOVE, EVEN IF YOU HAVE NOT ACTUALLY RECEIVED SUCH PAYMENT, 90 DAYS AFTER THE DATE STATED ABOVE UNLESS YOU FILE AN AFFIDAVIT OF NONPAYMENT PRIOR TO THE EXPIRATION OF SUCH 90 DAY PERIOD. THE FAILURE TO INCLUDE THIS NOTICE LANGUAGE ON THE FORM SHALL RENDER THE FORM UNENFORCEABLE AND INVALID AS A WAIVER AND RELEASE UNDER O.C.G.A. § 44-14-366.

Free Georgia lien waiver generator

Text to sub (3 free/mo)
Georgia: 90-day Affidavit of Nonpayment deadlineIf you are not paid, file an Affidavit of Nonpayment within 90 days after the waiver date. EZLienWaivers prints the exact deadline (waiver date + 90 calendar days) on screen, in the PDF and in the audit summary. O.C.G.A. § 44-14-366
Fill in blanks
Owner, check maker, retainage & 12 optional blanks
Mandatory Statutory Form StateStatutory form (state prescribes a single form for this payment stage)O.C.G.A. § 44-14-366(d)

Georgia prescribes one interim form for every progress payment (O.C.G.A. § 44-14-366(d)); it waives upon receipt of the sum and binds 90 days after execution unless an Affidavit of Nonpayment is filed. Printed verbatim.

WAIVER AND RELEASE OF LIEN AND PAYMENT BOND RIGHTS UPON INTERIM PAYMENT

STATE OF GEORGIA

COUNTY OF __________

THE UNDERSIGNED MECHANIC AND/OR MATERIALMAN HAS BEEN EMPLOYED BY __________ (NAME OF CONTRACTOR) TO FURNISH __________ (DESCRIBE MATERIALS AND/OR LABOR) FOR THE CONSTRUCTION OF IMPROVEMENTS KNOWN AS __________ (TITLE OF THE PROJECT OR BUILDING) WHICH IS LOCATED IN THE CITY OF __________, COUNTY OF __________, AND IS OWNED BY __________ (NAME OF OWNER) AND MORE PARTICULARLY DESCRIBED AS FOLLOWS:

____________________________________________________________ (DESCRIBE THE PROPERTY UPON WHICH THE IMPROVEMENTS WERE MADE BY USING EITHER A METES AND BOUNDS DESCRIPTION, THE LAND LOT DISTRICT, BLOCK AND LOT NUMBER, OR STREET ADDRESS OF THE PROJECT.)

UPON THE RECEIPT OF THE SUM OF $__________, THE MECHANIC AND/OR MATERIALMAN WAIVES AND RELEASES ANY AND ALL LIENS OR CLAIMS OF LIENS IT HAS UPON THE FOREGOING DESCRIBED PROPERTY OR ANY RIGHTS AGAINST ANY LABOR AND/OR MATERIAL BOND THROUGH THE DATE OF __________ (DATE) AND EXCEPTING THOSE RIGHTS AND LIENS THAT THE MECHANIC AND/OR MATERIALMAN MIGHT HAVE IN ANY RETAINED AMOUNTS, ON ACCOUNT OF LABOR OR MATERIALS, OR BOTH, FURNISHED BY THE UNDERSIGNED TO OR ON ACCOUNT OF SAID CONTRACTOR FOR SAID BUILDING OR PREMISES.

GIVEN UNDER HAND AND SEAL THIS ______ DAY OF ______________, ____.

____________________ (SEAL)

_________________________

____________________ (WITNESS)

Witness printed name: ____________________

_______________________ (ADDRESS)

NOTICE: WHEN YOU EXECUTE AND SUBMIT THIS DOCUMENT, YOU SHALL BE CONCLUSIVELY DEEMED TO HAVE WAIVED AND RELEASED ANY AND ALL LIENS AND CLAIMS OF LIENS UPON THE FOREGOING DESCRIBED PROPERTY AND ANY RIGHTS REGARDING ANY LABOR OR MATERIAL BOND REGARDING THE SAID PROPERTY TO THE EXTENT (AND ONLY TO THE EXTENT) SET FORTH ABOVE, EVEN IF YOU HAVE NOT ACTUALLY RECEIVED SUCH PAYMENT, 90 DAYS AFTER THE DATE STATED ABOVE UNLESS YOU FILE AN AFFIDAVIT OF NONPAYMENT PRIOR TO THE EXPIRATION OF SUCH 90 DAY PERIOD. THE FAILURE TO INCLUDE THIS NOTICE LANGUAGE ON THE FORM SHALL RENDER THE FORM UNENFORCEABLE AND INVALID AS A WAIVER AND RELEASE UNDER O.C.G.A. § 44-14-366.

All four Georgia waiver types, as printed

Conditional Waiver & Release on Progress Payment

Statutory form (state prescribes a single form for this payment stage)O.C.G.A. § 44-14-366(d)

Georgia prescribes one interim form for every progress payment (O.C.G.A. § 44-14-366(d)); it waives upon receipt of the sum and binds 90 days after execution unless an Affidavit of Nonpayment is filed. Printed verbatim.

WAIVER AND RELEASE OF LIEN AND PAYMENT BOND RIGHTS UPON INTERIM PAYMENT

STATE OF GEORGIA

COUNTY OF __________

THE UNDERSIGNED MECHANIC AND/OR MATERIALMAN HAS BEEN EMPLOYED BY __________ (NAME OF CONTRACTOR) TO FURNISH __________ (DESCRIBE MATERIALS AND/OR LABOR) FOR THE CONSTRUCTION OF IMPROVEMENTS KNOWN AS __________ (TITLE OF THE PROJECT OR BUILDING) WHICH IS LOCATED IN THE CITY OF __________, COUNTY OF __________, AND IS OWNED BY __________ (NAME OF OWNER) AND MORE PARTICULARLY DESCRIBED AS FOLLOWS:

____________________________________________________________ (DESCRIBE THE PROPERTY UPON WHICH THE IMPROVEMENTS WERE MADE BY USING EITHER A METES AND BOUNDS DESCRIPTION, THE LAND LOT DISTRICT, BLOCK AND LOT NUMBER, OR STREET ADDRESS OF THE PROJECT.)

UPON THE RECEIPT OF THE SUM OF $__________, THE MECHANIC AND/OR MATERIALMAN WAIVES AND RELEASES ANY AND ALL LIENS OR CLAIMS OF LIENS IT HAS UPON THE FOREGOING DESCRIBED PROPERTY OR ANY RIGHTS AGAINST ANY LABOR AND/OR MATERIAL BOND THROUGH THE DATE OF __________ (DATE) AND EXCEPTING THOSE RIGHTS AND LIENS THAT THE MECHANIC AND/OR MATERIALMAN MIGHT HAVE IN ANY RETAINED AMOUNTS, ON ACCOUNT OF LABOR OR MATERIALS, OR BOTH, FURNISHED BY THE UNDERSIGNED TO OR ON ACCOUNT OF SAID CONTRACTOR FOR SAID BUILDING OR PREMISES.

GIVEN UNDER HAND AND SEAL THIS ______ DAY OF ______________, ____.

____________________ (SEAL)

_________________________

____________________ (WITNESS)

Witness printed name: ____________________

_______________________ (ADDRESS)

NOTICE: WHEN YOU EXECUTE AND SUBMIT THIS DOCUMENT, YOU SHALL BE CONCLUSIVELY DEEMED TO HAVE WAIVED AND RELEASED ANY AND ALL LIENS AND CLAIMS OF LIENS UPON THE FOREGOING DESCRIBED PROPERTY AND ANY RIGHTS REGARDING ANY LABOR OR MATERIAL BOND REGARDING THE SAID PROPERTY TO THE EXTENT (AND ONLY TO THE EXTENT) SET FORTH ABOVE, EVEN IF YOU HAVE NOT ACTUALLY RECEIVED SUCH PAYMENT, 90 DAYS AFTER THE DATE STATED ABOVE UNLESS YOU FILE AN AFFIDAVIT OF NONPAYMENT PRIOR TO THE EXPIRATION OF SUCH 90 DAY PERIOD. THE FAILURE TO INCLUDE THIS NOTICE LANGUAGE ON THE FORM SHALL RENDER THE FORM UNENFORCEABLE AND INVALID AS A WAIVER AND RELEASE UNDER O.C.G.A. § 44-14-366.

Unconditional Waiver & Release on Progress Payment

Statutory form (state prescribes a single form for this payment stage)O.C.G.A. § 44-14-366(d)

Georgia has no separate unconditional form; its single interim form (O.C.G.A. § 44-14-366(d)) is printed verbatim.

WAIVER AND RELEASE OF LIEN AND PAYMENT BOND RIGHTS UPON INTERIM PAYMENT

STATE OF GEORGIA

COUNTY OF __________

THE UNDERSIGNED MECHANIC AND/OR MATERIALMAN HAS BEEN EMPLOYED BY __________ (NAME OF CONTRACTOR) TO FURNISH __________ (DESCRIBE MATERIALS AND/OR LABOR) FOR THE CONSTRUCTION OF IMPROVEMENTS KNOWN AS __________ (TITLE OF THE PROJECT OR BUILDING) WHICH IS LOCATED IN THE CITY OF __________, COUNTY OF __________, AND IS OWNED BY __________ (NAME OF OWNER) AND MORE PARTICULARLY DESCRIBED AS FOLLOWS:

____________________________________________________________ (DESCRIBE THE PROPERTY UPON WHICH THE IMPROVEMENTS WERE MADE BY USING EITHER A METES AND BOUNDS DESCRIPTION, THE LAND LOT DISTRICT, BLOCK AND LOT NUMBER, OR STREET ADDRESS OF THE PROJECT.)

UPON THE RECEIPT OF THE SUM OF $__________, THE MECHANIC AND/OR MATERIALMAN WAIVES AND RELEASES ANY AND ALL LIENS OR CLAIMS OF LIENS IT HAS UPON THE FOREGOING DESCRIBED PROPERTY OR ANY RIGHTS AGAINST ANY LABOR AND/OR MATERIAL BOND THROUGH THE DATE OF __________ (DATE) AND EXCEPTING THOSE RIGHTS AND LIENS THAT THE MECHANIC AND/OR MATERIALMAN MIGHT HAVE IN ANY RETAINED AMOUNTS, ON ACCOUNT OF LABOR OR MATERIALS, OR BOTH, FURNISHED BY THE UNDERSIGNED TO OR ON ACCOUNT OF SAID CONTRACTOR FOR SAID BUILDING OR PREMISES.

GIVEN UNDER HAND AND SEAL THIS ______ DAY OF ______________, ____.

____________________ (SEAL)

_________________________

____________________ (WITNESS)

Witness printed name: ____________________

_______________________ (ADDRESS)

NOTICE: WHEN YOU EXECUTE AND SUBMIT THIS DOCUMENT, YOU SHALL BE CONCLUSIVELY DEEMED TO HAVE WAIVED AND RELEASED ANY AND ALL LIENS AND CLAIMS OF LIENS UPON THE FOREGOING DESCRIBED PROPERTY AND ANY RIGHTS REGARDING ANY LABOR OR MATERIAL BOND REGARDING THE SAID PROPERTY TO THE EXTENT (AND ONLY TO THE EXTENT) SET FORTH ABOVE, EVEN IF YOU HAVE NOT ACTUALLY RECEIVED SUCH PAYMENT, 90 DAYS AFTER THE DATE STATED ABOVE UNLESS YOU FILE AN AFFIDAVIT OF NONPAYMENT PRIOR TO THE EXPIRATION OF SUCH 90 DAY PERIOD. THE FAILURE TO INCLUDE THIS NOTICE LANGUAGE ON THE FORM SHALL RENDER THE FORM UNENFORCEABLE AND INVALID AS A WAIVER AND RELEASE UNDER O.C.G.A. § 44-14-366.

Conditional Waiver & Release on Final Payment

Statutory form (state prescribes a single form for this payment stage)O.C.G.A. § 44-14-366(e)

Georgia prescribes one final-payment form (O.C.G.A. § 44-14-366(e)); printed verbatim.

WAIVER AND RELEASE OF LIEN AND PAYMENT BOND RIGHTS UPON FINAL PAYMENT

STATE OF GEORGIA

COUNTY OF __________

THE UNDERSIGNED MECHANIC AND/OR MATERIALMAN HAS BEEN EMPLOYED BY __________ (NAME OF CONTRACTOR) TO FURNISH __________ (DESCRIBE MATERIALS AND/OR LABOR) FOR THE CONSTRUCTION OF IMPROVEMENTS KNOWN AS __________ (TITLE OF THE PROJECT OR BUILDING) WHICH IS LOCATED IN THE CITY OF __________, COUNTY OF __________, AND IS OWNED BY __________ (NAME OF OWNER) AND MORE PARTICULARLY DESCRIBED AS FOLLOWS:

____________________________________________________________ (DESCRIBE THE PROPERTY UPON WHICH THE IMPROVEMENTS WERE MADE BY USING EITHER A METES AND BOUNDS DESCRIPTION, THE LAND LOT DISTRICT, BLOCK AND LOT NUMBER, OR STREET ADDRESS OF THE PROJECT.)

UPON THE RECEIPT OF THE SUM OF $__________, THE MECHANIC AND/OR MATERIALMAN WAIVES AND RELEASES ANY AND ALL LIENS OR CLAIMS OF LIENS IT HAS UPON THE FOREGOING DESCRIBED PROPERTY OR ANY RIGHTS AGAINST ANY LABOR AND/OR MATERIAL BOND ON ACCOUNT OF LABOR OR MATERIALS, OR BOTH, FURNISHED BY THE UNDERSIGNED TO OR ON ACCOUNT OF SAID CONTRACTOR FOR SAID PROPERTY.

GIVEN UNDER HAND AND SEAL THIS ______ DAY OF ______________, ____.

____________________ (SEAL)

_________________________

____________________ (WITNESS)

Witness printed name: ____________________

_______________________ (ADDRESS)

NOTICE: WHEN YOU EXECUTE AND SUBMIT THIS DOCUMENT, YOU SHALL BE CONCLUSIVELY DEEMED TO HAVE WAIVED AND RELEASED ANY AND ALL LIENS AND CLAIMS OF LIENS UPON THE FOREGOING DESCRIBED PROPERTY AND ANY RIGHTS REGARDING ANY LABOR OR MATERIAL BOND REGARDING THE SAID PROPERTY TO THE EXTENT (AND ONLY TO THE EXTENT) SET FORTH ABOVE, EVEN IF YOU HAVE NOT ACTUALLY RECEIVED SUCH PAYMENT, 90 DAYS AFTER THE DATE STATED ABOVE UNLESS YOU FILE AN AFFIDAVIT OF NONPAYMENT PRIOR TO THE EXPIRATION OF SUCH 90 DAY PERIOD. THE FAILURE TO INCLUDE THIS NOTICE LANGUAGE ON THE FORM SHALL RENDER THE FORM UNENFORCEABLE AND INVALID AS A WAIVER AND RELEASE UNDER O.C.G.A. § 44-14-366.

Unconditional Waiver & Release on Final Payment

Statutory form (state prescribes a single form for this payment stage)O.C.G.A. § 44-14-366(e)

Georgia has no separate unconditional form; its single final-payment form (O.C.G.A. § 44-14-366(e)) is printed verbatim.

WAIVER AND RELEASE OF LIEN AND PAYMENT BOND RIGHTS UPON FINAL PAYMENT

STATE OF GEORGIA

COUNTY OF __________

THE UNDERSIGNED MECHANIC AND/OR MATERIALMAN HAS BEEN EMPLOYED BY __________ (NAME OF CONTRACTOR) TO FURNISH __________ (DESCRIBE MATERIALS AND/OR LABOR) FOR THE CONSTRUCTION OF IMPROVEMENTS KNOWN AS __________ (TITLE OF THE PROJECT OR BUILDING) WHICH IS LOCATED IN THE CITY OF __________, COUNTY OF __________, AND IS OWNED BY __________ (NAME OF OWNER) AND MORE PARTICULARLY DESCRIBED AS FOLLOWS:

____________________________________________________________ (DESCRIBE THE PROPERTY UPON WHICH THE IMPROVEMENTS WERE MADE BY USING EITHER A METES AND BOUNDS DESCRIPTION, THE LAND LOT DISTRICT, BLOCK AND LOT NUMBER, OR STREET ADDRESS OF THE PROJECT.)

UPON THE RECEIPT OF THE SUM OF $__________, THE MECHANIC AND/OR MATERIALMAN WAIVES AND RELEASES ANY AND ALL LIENS OR CLAIMS OF LIENS IT HAS UPON THE FOREGOING DESCRIBED PROPERTY OR ANY RIGHTS AGAINST ANY LABOR AND/OR MATERIAL BOND ON ACCOUNT OF LABOR OR MATERIALS, OR BOTH, FURNISHED BY THE UNDERSIGNED TO OR ON ACCOUNT OF SAID CONTRACTOR FOR SAID PROPERTY.

GIVEN UNDER HAND AND SEAL THIS ______ DAY OF ______________, ____.

____________________ (SEAL)

_________________________

____________________ (WITNESS)

Witness printed name: ____________________

_______________________ (ADDRESS)

NOTICE: WHEN YOU EXECUTE AND SUBMIT THIS DOCUMENT, YOU SHALL BE CONCLUSIVELY DEEMED TO HAVE WAIVED AND RELEASED ANY AND ALL LIENS AND CLAIMS OF LIENS UPON THE FOREGOING DESCRIBED PROPERTY AND ANY RIGHTS REGARDING ANY LABOR OR MATERIAL BOND REGARDING THE SAID PROPERTY TO THE EXTENT (AND ONLY TO THE EXTENT) SET FORTH ABOVE, EVEN IF YOU HAVE NOT ACTUALLY RECEIVED SUCH PAYMENT, 90 DAYS AFTER THE DATE STATED ABOVE UNLESS YOU FILE AN AFFIDAVIT OF NONPAYMENT PRIOR TO THE EXPIRATION OF SUCH 90 DAY PERIOD. THE FAILURE TO INCLUDE THIS NOTICE LANGUAGE ON THE FORM SHALL RENDER THE FORM UNENFORCEABLE AND INVALID AS A WAIVER AND RELEASE UNDER O.C.G.A. § 44-14-366.